Delivery planning should begin while the order is being confirmed. Product size, glass weight, destination access and storage conditions influence the packing and handling arrangements.
Agree before dispatch
- The delivery destination and available vehicle access.
- Packing method, opening labels and shipping documents.
- Who is responsible for unloading and the equipment required.
- A safe, suitable storage area and the planned installation sequence.
On arrival
Check the shipment against the agreed documents and record visible packaging or product issues promptly. Keep opening references visible so the installation team can identify the correct units.
Keep communication clear
Confirm responsibilities and timing in the order documents. Transport, unloading and site handling arrangements should be understood before the shipment leaves the factory.