Talk to ENGGIA
ethan@enggia.comWhatsApp · +86 181 2666 6065
EN
Get a quote
Installation

Prepare for packing and delivery

Agree the route from factory dispatch to a ready installation site.

Hotels & workspaces

Delivery planning should begin while the order is being confirmed. Product size, glass weight, destination access and storage conditions influence the packing and handling arrangements.

Agree before dispatch

  • The delivery destination and available vehicle access.
  • Packing method, opening labels and shipping documents.
  • Who is responsible for unloading and the equipment required.
  • A safe, suitable storage area and the planned installation sequence.

On arrival

Check the shipment against the agreed documents and record visible packaging or product issues promptly. Keep opening references visible so the installation team can identify the correct units.

Keep communication clear

Confirm responsibilities and timing in the order documents. Transport, unloading and site handling arrangements should be understood before the shipment leaves the factory.

Discuss your project

Share your drawings, location and opening schedule with ENGGIA. We can help you compare suitable configurations before you confirm an order.

Start a conversation · More planning guides

ENGGIA / WINDOWS & DOORS

Let’s discuss your project.

Share your drawings, opening dimensions and project location with ENGGIA.

Your visit is confirmed only after our team contacts you. Times are in Foshan, China (UTC+8).

Sample availability, cost and delivery will be confirmed by our team.

About you and your project (optional)
About you · I am a
Project type

We use your details to respond to your inquiry. Privacy notice

Open image ↗