Start with the site and window schedule
Give the project location, building type and whether it is a new build or renovation. Number each opening on a schedule and keep the same references on the drawings. Include width, height, quantity, opening direction, frame finish and any flyscreen requirements. Identify whether dimensions describe the rough opening or the intended frame size.
Bring the project performance requirements
Ask the project designer or builder for the wind-pressure, water-resistance, glazing and energy requirements that apply to the project. Supply these with the enquiry so the selected system and relevant test documentation can be reviewed together. An AS 2047 reference in a catalogue is a starting point; compare the report’s product, tested dimensions and configuration to the proposed order.
Resolve the wall interface before production
Include wall sections and details around the sill, head and jamb. For renovation, photograph the existing frame and explain what will stay. Discuss sub-sills, timber reveals, T-fins, fixings and drainage as applicable. Confirm who is responsible for final measurement, installation and weatherproofing at the site.
Compare quotations on the same scope
Review the frame system, glazing, hardware, screens, finishes and installation accessories line by line. Ask what drawings and documentation are included. Agree packaging, delivery terms and responsibilities in writing; obtain current freight and import-cost advice for the order rather than relying on a fixed estimate from an old project.
Keep an agreed revision for the order
Before production, reconcile the final schedule with the approved shop drawings and quotation. Confirm dimensions, quantities, opening direction and configuration against the same revision. Plan unloading, protected storage and site access with the receiving team.